Kolmio
The Kolmio is a unique tourist building offering a stunning view of nature. The basic model includes underfloor heating, mechanical ventilation and an air-source heat pump. Can be equipped according to your needs and quick to install.
-
Description
The Kolmio (triangle) is a stylish and unique modular building, ideal for tourist use. The basic model has a floor area of around 35 m² and includes modern facilities such as underfloor heating, mechanical ventilation and an energy-efficient air-source heat pump. The triangle can be equipped according to the client’s wishes, so a panoramic window can be added, or even a terrace to extend the living space outside.
We tailor buildings to your needs
Explore our models and share your plans with us
Marko Alamartimo
Business Development Director, TSV-Invest Oy
Features
Modern layout
The building has a modern and natural look. Its iconic triangular roofline and large windows create an elegant look that blends beautifully with the surrounding landscape.
Nature comes close
Large windows and an optional panoramic window bring in plenty of natural light and open up a stunning view outside. The model is ideal for admiring the Northern Lights as well as the night sky.
Fully equipped bathroom
A modern bathroom with underfloor heating and a shower provides all the necessary amenities for travellers during their stay.
Fast delivery and installation
The building is delivered as a whole directly to your plot. It is designed to be quickly transported and installed ready for use.
Modular structure
The building can be customised with a terrace or a panoramic window. There are also different interior design options.
Cosy living all year round
The apartment is equipped with mechanical ventilation, underfloor heating and an air-source heat pump, ensuring comfortable conditions in both winter and summer.



