Loma
The stylish and modern Loma modular building is ideal for tourist use. The basic model has 35m² of space and can be customised with a loft and terrace.
-
Description
The basic Loma (holiday) model has a surface area of 35 m² and includes high-quality materials and fittings, such as underfloor heating and an air-source heat pump. The building can be customised to suit your needs, with a range of additional modules and equipment available. Options include a loft, panoramic windows, jacuzzi and terrace.
We tailor buildings to your needs
Explore our models and share your plans with us
Marko Alamartimo
Business Development Director, TSV-Invest Oy
Features
Modern layout
Loma that stands out. The building’s layout is very modern and elegant, with a clear and elegant design.
Panoramic windows
Large panoramic windows let in plenty of natural light and open up a stunning view outside. The model is perfect for admiring the Northern Lights as well as the night sky.
Fully equipped bathroom
A modern bathroom with underfloor heating and a shower provides all the necessary amenities for travellers during their stay.
Fast delivery and installation
The building is delivered as a whole directly to your plot. It is designed so that it can be transported and installed quickly, ready to use.
Modular structure
The building can be customised with additional modules according to your needs. The additional modules come as separate units, allowing the building to be extended at a later date.
Cosy living all year round
The Loma home is equipped with mechanical ventilation, underfloor heating and an air-source heat pump to ensure comfortable conditions in both winter and summer.








