Päre
The Päre is a stylish and modern modular building, ideal for tourist use. The basic model has 35m² of space and can be customised with a loft, sauna or terrace.
-
Description
The basic model has a floor area of 35 m² and includes quality finishes and fittings, such as underfloor heating and an air-source heat pump. The building can be tailored to your needs, with a range of additional modules and equipment available. Options include a loft, panoramic windows, a sauna or spa module, a jacuzzi and a terrace. Delivered complete to the plot
We tailor buildings to your needs
Explore our models and share your plans with us
Marko Alamartimo
Business Development Director, TSV-Invest Oy
Features
Modern layout
The Päre stands out. The building has a modern and elegant design, combining natural materials and clean lines to create a harmonious whole.
Panoramic windows
Large panoramic windows let in plenty of natural light and open up a stunning view outside. The model is perfect for admiring the northern lights as well as the night sky.
Fully equipped bathroom
A modern bathroom with underfloor heating and a shower provides all the necessary amenities for travellers during their stay.
Fast delivery and installation
The building is delivered as a whole directly to your plot. It is designed to be quickly transported and installed ready for direct use.
Modular structure
The building can be customised with a sauna or spa module. The additional modules come as separate units, which allows the building to be extended at a later date.
Cosy living all year round
The apartment is equipped with mechanical ventilation, underfloor heating and an air-source heat pump, ensuring comfortable conditions in both winter and summer.








