Rakovakea
Rakovalkea is a stunning modular building with different versions that offer a wide range of possibilities for tourist use. The basic model has a surface area of 34m² and is well designed to be very spacious for two adults or a family. The number of fittings and windows can be chosen to suit the layout of the site. The panoramic windows offer a great opportunity to enjoy the scenery and possible northern lights.
-
Description
The bright and airy floor area is 34 m² and includes quality finishes and fittings such as underfloor heating, air-source heat pump and a heated skylight. The building can be tailored to your needs, with a range of additional modules and equipment available. Options include a covered entrance, panoramic windows to the main and side elevations, a terrace and a jacuzzi. The building is delivered to the plot as a whole.
We tailor buildings to your needs
Explore our models and share your plans with us
Marko Alamartimo
Business Development Director, TSV-Invest Oy
Features
Modern layout
Rakovalkea is an impressive building that offers a modern and stylish ensemble. The exterior can be changed by the position of windows, materials and fittings.
Panoramic windows
The panoramic windows, the size of the entire building’s roof, integrate nature into the whole. The model is perfect for admiring both the northern lights and the night sky.
Fully equipped bathroom
A modern bathroom with underfloor heating and a shower provides all the necessary amenities for travellers during their stay.
Fast delivery and installation
The building is delivered as a whole directly to your plot. It is designed so that it can be transported and installed quickly, ready to use.
Modular structure
The building can be tailored to your needs, with windows at the ends and sides or in places that suit the layout. Additional modules are available for the basic model, including a covered entrance and a terrace, which can also accommodate a hot tub.
Comfort and energy efficiency
The Rakovalkea has mechanical ventilation, underfloor heating, an air-source heat pump and a heated skylight. These features and the most efficient insulation material on the market ensure comfortable conditions in winter and summer, as well as saving on energy costs.




